5Distillery pipework installation
A recent pipework installation at a distillery: stainless process lines, valve sets and pump connections fabricated and installed on site.

Projects
Distillery pipework, dairy CIP tanks, boiler D-patch repairs and bespoke fabrication. Every photo is from a real TMEWS job.
5A recent pipework installation at a distillery: stainless process lines, valve sets and pump connections fabricated and installed on site.
2Furnace D-patch repair welded in place and completed with full NDT.
3Boiler access chamber cut out and prepared for a D-patch, ready for welding.
2Stainless clean-in-place tanks fabricated and welded by Tommy, then installed at the dairy.
1Stainless pipework and support framing for a distillery, installed by Tommy.
2Heavy-duty steel backing gates fabricated for a dairy farm.
Gallery
More of Tommy's work. Tap any photo to enlarge.
Video
Short clips from the workshop and site, including welding a slip-on 6" PN40 carbon flange onto a 6" Schedule 40 steam line.

Talk to Tommy direct
Send drawings, photos or just a description. You'll speak to the owner, not a call centre, and get a straight answer on price and timing.